Evidence-led · Community-informed · Open to correctionRead the methodology →
← Back to the map

Policy & approvals tracker

Follow the rules behind the buildout

A source-linked view of Union and state data-centre frameworks, including documents that are active, draft, expired or still cited as legacy policy.

Status checked 15 Jul 2026 · Policies change; always read the linked document

8Frameworks indexedwith direct source links
5Marked activeas of the editorial check
7State frameworksplus one Union draft
1Expired / unverified successorstatus explicitly labelled

Policy landscape

State action is not one national rulebook

The Union document in this tracker is a draft. State policies vary in dates, incentives, power treatment and planning rules.

8 documents shown
Loading policy map…

Document tracker

Read the source, then check the date

Status labels reflect the linked source and our latest check. They are editorial aids, not legal advice.

DraftUnion

India

Data Centre Policy 2020

MeitY's nationally circulated document remains explicitly marked as a draft for discussion; it should not be described as enacted law.

InfrastructureEnergyInvestment
Ministry of Electronics & IT
ActiveState

Uttar Pradesh

Uttar Pradesh Data Centre Policy 2026

The state published its 2026 policy in July. This tracker links to the official policy page rather than restating incentives without context.

InvestmentPowerLand
Invest UP
ActiveState

Andhra Pradesh

Data Center Policy 4.0, 2024–29

A state framework for large digital-infrastructure investment, relevant to the Visakhapatnam project pipeline.

InvestmentRenewablesConnectivity
Andhra Pradesh IT
ActiveState

Karnataka

Data Centre Policy 2022–27

Operational guidelines describe implementation and incentives. The policy is tracked through May 2027 unless replaced earlier.

PlanningPowerInvestment
Karnataka Digital Economy Mission
Expired / successor unverifiedState

Tamil Nadu

Tamil Nadu Data Centre Policy 2021

The published validity ran to 31 March 2026. We retain it as historical context and do not assume continuation without a successor document.

InvestmentPowerWater
Government of Tamil Nadu
ActiveState

Maharashtra

IT & ITeS Policy 2023 — data-centre provisions

Data-centre provisions sit within the wider state IT policy, including infrastructure and power-generation treatment.

PowerPlanningInvestment
Government of Maharashtra policy copy
Legacy frameworkState

Telangana

Data Centres Policy 2016

An older sector policy still cited in state investment announcements. Current project-specific approvals must be checked separately.

PowerRenewablesInvestment
Government of Telangana
ActiveState

West Bengal

Data Centre Policy 2021

A state sector policy included here with a direct link to the official IT department policy portal.

InvestmentLandConnectivity
West Bengal IT & Electronics Department

Permit explorer blueprint

What one approval record can reveal

Policy pages describe incentives. Project approvals often hold the more local facts. Sunny Data Center Observatory's record model is ready to capture them as each verified filing is added.

See the permit-source hierarchy →
01Proposal number & current status
02Project phase & built-up area
03Power demand & source
04Water source, demand & cooling design
05Diesel-generator capacity
06Environmental conditions & compliance reports

Missing a policy or approval?

Send the primary document, not just a headline.

We accept source links and corrections through the private reporting workflow.

Share a document